Weather Permitting
W. Bondsville Road:
- 10/16- Base Repairs including milling and 25mm Base material installed.
- Asphalt Leveling.
- 10/17- Fabric and 9.5mm Overlay
Park Drive:
- 10/11- R&R Curb and Install new HC Ramp
- 10/16- Base Repairs including milling and 25mm Base material installed.
- Install 9.5mm Wearing
Magnolia Court:
- 10/12- R&R Curb
- 10/13- Finish Concrete Curb.
- 10/17- Base Repairs including milling and 25mm Base material installed.
- Install 9.5mm Wearing
Summit Ave:
- 10/18-19- Base Repairs including milling and 25mm Base material installed.
- Install 9.5mm Leveling, fabric and 9.5 Overlay
- 10/18-19-20- Base Repairs including milling and 25mm Base material installed.
- Install 9.5mm Leveling, Fabric and 9.5mm Overlay
- 10/20- Install Swale.
- 10/18-19-20- Base Repairs including milling and 25mm Base material installed.
- Install 9.5mm Leveling, Fabric and 9.5mm Overlay
- 10/23- Milling to allow for overlay
- Install 9.5mm Wearing
- 10/23-24-25- Base Repairs including milling and 25mm Base material installed.
- Regrade in order to super elevate the East end of Reed creating a swale to allow the runoff to properly flow.
- Install Leveling as per new Drawing on the west end of Reed in order to elevate the one side, 140’ lineal feet in from the intersection heading East
- Install 9.5mm Wearing.
- Regrade in order to super elevate the East end of Reed creating a swale to allow the runoff to properly flow.